Ice cream shop opening at the HUB

I scream, you scream, UCR ice cream. Highlanders will no longer have to look far for frozen treats on campus. An ice cream shop with exclusive UC Riverside citrus flavors is opening at the HUB. Scoops Ice Cream Shop will open Thursday, Sept. 26, the first day of instruction for the fall quarter. Located in the food court, the ice cream shop will...

By Imran Ghori |

Chancellor kicks off new academic year with picnic

UC Riverside celebrated the start of a new academic year with the Chancellor’s Faculty and Staff Picnic Tuesday, Sept. 10. For the second year, the picnic was held at the HUB Plaza. Some attendees dined at the outdoor patio while others gathered inside the HUB for shade and cooler temperatures during the heat. Chancellor Kim A. Wilcox welcomed...

By Imran Ghori |

Study abroad program grows in popularity

A UC Riverside program offering students an opportunity to study abroad in faculty-taught courses reached a milestone this summer with its largest number of classes and enrollees since the pandemic. The Faculty-Led Education Abroad Program, or FLEAP, had 109 students in nine courses, its highest number since 2018 when it had 119 students. The...

By Imran Ghori |

Staff fair kicks off the fall

The Community Partner Fair returns to UC Riverside on Sept. 18, providing opportunities to learn about resources and services as the new academic year starts. The fair, sponsored by UCR Staff Assembly, will feature more than 40 vendors, activities, shaved ice, and prize drawings. It will take place from 10 a.m. to 2 p.m. under the arches in front...

By Imran Ghori |

Arts Building improvements underway

A summer renovation project of UC Riverside’s Arts Building will help fix drainage problems at the site. Since June, the building has been surrounded by fencing as construction crews began work. The project involves removing concrete in some areas of the outside plaza level of the building. A new concrete surface has been added in these areas with...

By Imran Ghori |

NSF grant supports science to policy program

UC Riverside has received a nearly half-million-dollar grant from the National Science Foundation to build on a program training graduate students in science communication and create a national framework for science policy training. For six years, the Science to Policy program, or S2P, has offered a certificate course providing students the tools...

By Imran Ghori |

New campus plantings tests water savings

UC Riverside is testing out a new ground cover plant that could reduce water usage while keeping the campus looking green. Kurapia, a low-growing leafy ground cover, was planted at the Pentland Hills and Glen Mor student residence halls by Facilities Services in late June. The landscape crew is testing out the plant, which requires less water than...

By Imran Ghori |

New School of Medicine building wins design/construction awards

UC Riverside’s new School of Medicine instructional building won two awards from a construction industry trade publication. The School of Medicine Education Building II, which opened in September 2023 after two years of construction, received the Award of Merit in the Excellence in Sustainability category and an Award of Merit in Higher Education...

By Imran Ghori |

Prep work begins for new classroom and instructional lab building

Preliminary work has begun on UC Riverside’s new instructional building complex. The area around Parking Lot 19, south of the UCR Soccer Stadium, was fenced off in June as crews begin demolishing the asphalt surface to prepare the site for construction of the Undergraduate Teaching and Learning Facility. The 100,700-square-foot four-story building...

By Imran Ghori |

Physics Building roof replacement begins

UC Riverside’s Physics Building will get a new roof as part of a renovation of the aging building. Construction work began June 17 with the work expected to be completed by September in time for the fall quarter. The project involves completely demolishing the roof and replacing it with a new roofing system, said Fernando Nunez, a project manager...

By Imran Ghori |

UCR advisor helped eliminate “probation” from academic language

The University of California has dropped the word “probation” from academic regulations – a change that a UC Riverside academic advisor helped push forward. The UC Academic Senate voted overwhelmingly on June 21 to remove the term probation and replace it with academic notice to alert students when they are falling behind in their studies. Brett...

By Imran Ghori |

New scooter racks installed on campus

Electric scooter, skateboard, and bicycle riders will have more places on campus to park their rides. Facilities Services installed 18 new racks in several spots around UC Riverside’s Highlander Union Building, or HUB, in late June. The new racks fit both scooters and skateboards, said Manny Sanchez, facilities supervisor for the HUB. The racks...

By Imran Ghori |

Highlander Farewells

Highlander Farewells is a recurring feature spotlighting faculty and staff members who recently retired or are retiring soon. Find out more about the contributions of UCR colleagues with 25 years or more of service in the short profiles that follow. Retirees with less than 25 years or who did not provide profile information are listed below. The...

By UCR News |

North District housing complex walls go up

Three large cranes, more than 10 stories high, tower over UC Riverside’s North District Phase 2 project, lifting wall panels and setting them into place. Construction crews at the project site have been repeating those steps over the last few weeks as the student housing project moves forward with the next phase of construction. West of the first...

By Imran Ghori |

UCR Library archives inspire literary and arts magazine

The UC Riverside Library’s vast collection of rare manuscripts, photographs, books, and other material in its Special Collections and University Archives has long been a valuable resource for scholars researching history. A new arts and literary magazine published by the library showcases writers and artists who used it as inspiration to create new...

By Imran Ghori |

Keeping the campus in bloom

Bright blooms can be spotted around the UC Riverside campus with new spring flower plantings. In May, Facilities Services planted over 800 flowers in key areas of campus that are expected to bloom all summer long. It’s part of a regular rotation to provide variety and vibrant colors timed to different seasons by the Landscape Services team. At the...

By Imran Ghori |

Commencement celebrations begin with Senior Sendoff

Highlanders began their commencement celebrations with a week of festivities including Senior Sendoff at UC Riverside’s Rivera Lawn on Thursday, May 21. More than 700 seniors attended the event, which included free food and swag, photobooths, celebratory stations, a graduation cap decoration station, and music from KUCR. Senior Sendoff was...

By UCR News |

Extracurricular: UCR analyst’s art travels to Romania

Maggie Tello Case thought she was being phished when she received an email in January from curator Claire D’Alba representing the Art in Embassies program at the United States Department of State. D’Alba was requesting Tello Case, a senior contracts and grants analyst in UCR’s College of Natural & Agricultural Sciences, lend some of her artwork for...

By J.D. Mathes |

Middle schoolers get a crash course in sustainability

About 100 Riverside middle school students recently learned about the importance of sustainable food production through hands-on activities with UC Riverside scientists. Students from the Riverside STEM Academy visited the campus May 9 for the first Circular Economy and Sustainable Food Production Day, hosted by Georgios Vidalakis, a professor and...

By UCR News |

Batchelor Hall renovation nearing completion

A major renovation of UC Riverside’s Batchelor Hall is nearing completion after almost two years of construction. The work, which includes significant upgrades to the building’s mechanical, electrical, and plumbing systems, will be finished by the end of June. Work began in fall 2022. Old and outdated pipes, wiring, and mechanical equipment across...

By Imran Ghori |